Structure, shell and whole projects
14 packagesThe packages that carry the building. If your job has a frame, a foundation or a programme, it starts in this group.
- C-01 General contracting One contractor holds the whole job — every trade, the programme, the material chain and the risk — under one contract.
- C-02 New build villas New villa construction from plot assessment through approvals to handover.
- C-03 Hotel construction and refurbishment Closed-season refurbishment and new hotel construction, programmed backwards from your opening date.
- C-04 Turnkey construction Design, approvals, construction and fit-out delivered as one package to a finished building.
- C-05 Cave house (yposkafo) construction New cave-house excavation and vaulting, engineered for the material rather than styled after it.
- C-06 Cave house renovation and restoration Yposkafo restoration: geometry, moisture and the damage done by earlier well-meaning work.
- C-07 Full property renovation Full renovation of existing property, including the junction between original stone and later additions.
- C-08 Structural works and concrete Frames, slabs, beams and structural repair specified for coastal exposure and seismic design.
- C-09 Demolition and strip-out Demolition and strip-out including hand demolition where no machine can reach.
- C-10 Excavation and earthworks Excavation, earthworks and spoil removal in layered volcanic ground.
- C-11 Retaining walls and terracing Retaining wall construction and repair, including traditional dry stone terracing.
- C-12 Extensions Extensions, including the structural junction between new work and existing buildings.
- C-13 Seismic retrofitting and strengthening Structural strengthening of stone and concrete buildings, following an engineer's assessment.
- C-14 Project management Programme, procurement, cost control and supervision — with or without us holding the build.
Santorini-specific technical work
07 packagesProblems this island generates that mainland practice does not have a standard answer for. This is the group that most often decides whether a project succeeds.
- T-01 Caldera-edge construction and rock stabilisation Construction and rock stabilisation on the caldera face, where geology governs the design.
- T-02 Yposkafo excavation and vault engineering Cutting and vaulting into welded tuff, where profile, span and cover are a single structural equation.
- T-03 Salt-air corrosion protection Corrosion protection and concrete repair for a marine-exposure environment.
- T-04 Foundations in volcanic ground Foundation design decided by what the trial pit finds, not by what the neighbour did.
- T-05 Traditional settlement compliance Designing and approving work in designated settlements, where external appearance is controlled.
- T-06 Cave house damp control Damp control in cave houses: breathable finishes, ventilation, and water routing above the vault.
- T-07 Seismic design and construction Seismic design for new construction, and the junction between new work and old buildings.
Trades and finishes
37 packagesEach of these is a package a main contractor can hold rather than you appointing it separately. Any of them can also be taken as a standalone job.
- F-01 Electrical installation Rewiring, board upgrades, fault-finding and external installation specified for salt exposure.
- F-02 Plumbing Plumbing for cistern, network, tanker and desalinated supply, including pressure and treatment.
- F-03 Painting and decorating Lime wash, breathable systems and exterior repainting cycles for a high-UV, salt-laden environment.
- F-04 Plastering and lime render Lime and pozzolanic render, traditional finishes, and stripping out failed cement work.
- F-05 Masonry and stonework Traditional stone walling, repointing in compatible mortar, and dry stone terracing.
- F-06 Waterproofing and damp proofing Terrace, roof and wet-room waterproofing detailed for thermal movement and full sun exposure.
- F-07 Roofing Flat terrace roofs, traditional vaults, wind uplift and rainwater collection.
- F-08 Insulation Roof-first insulation strategy for a cooling-dominated climate, with shading and ventilation.
- F-09 Air conditioning and HVAC Air conditioning installation with condenser siting that satisfies settlement rules and salt exposure.
- F-10 Solar water heaters Solar hot water installation, descaling, servicing and wind-rated mounting.
- F-11 Photovoltaic installation Photovoltaic systems designed for high irradiance, strong wind loading and dust.
- F-12 Swimming pool construction Pool construction on sloping and caldera-edge sites, including structure, plant and water supply.
- F-13 Pool maintenance In-season pool servicing and closed-season care for villas, rentals and hotels.
- F-14 Landscaping and hardscaping Dry planting, wind and salt tolerance, terracing and hard landscaping in volcanic ground.
- F-15 Flooring Interior and terrace flooring where build-up depth, moisture from below and movement govern the choice.
- F-16 Tiling Tiling for terraces and wet rooms, detailed so movement never reaches the waterproofing.
- F-17 Carpentry and joinery Made-to-measure joinery, built-in furniture for vaulted rooms, doors, shutters and external timber.
- F-18 Windows and doors Aluminium, uPVC and timber windows specified for wind loading, salt and settlement rules.
- F-19 Glass and balustrades Structural glass balustrades and glazing specified for wind loading and salt-air corrosion.
- F-20 Metalwork, welding and railings Railings, gates, structural steel and traditional ironwork specified for a salt-laden environment.
- F-21 Marble and granite Marble and granite surfaces, thresholds and traditional details, including access-constrained delivery.
- F-22 Kitchen fitting Made-to-measure kitchens for vaulted and irregular rooms, with the supply chain planned around the ferry.
- F-23 Bathroom fitting Bathroom renovation solved around drainage falls, extract ventilation and waterproofing.
- F-24 Drainage and septic systems Drainage, cesspits and septic systems, including capacity for peak seasonal occupancy.
- F-25 Water cisterns (sterna) Cistern construction, restoration and re-plastering, plus catchment and first-flush arrangements.
- F-26 Smart home systems Leak detection, remote monitoring, keyless entry and climate control for empty and rented properties.
- F-27 Security and CCTV CCTV, alarms and monitoring for empty properties, with the data-protection side handled properly.
- F-28 Scaffolding and access Scaffolding and access on stepped, sloping and cliff-edge sites, including wind-rated design.
- F-29 Post-construction cleaning Post-construction cleaning and pre-season hotel deep cleans, including cement haze on stone.
- F-30 Property maintenance and handyman Scheduled checks, storm response, repairs, locks and pest control for properties left empty.
- F-31 Emergency repairs Storm damage, leaks and urgent failures — made safe fast, with honest timelines on permanent repair.
- F-32 Locksmith Lockouts, snapped keys, cylinder changes, safes and gate locks — and the salt problem behind most of them.
- F-33 Appliance repair Fridges, washers, ovens and commercial kitchen equipment — and the parts logistics behind every repair.
- F-34 Pest control Ants, rodents, wasps, mosquitoes and bed bugs — plus the certification tourist accommodation needs.
- F-35 Pergolas and shading Pergolas, sails and awnings engineered for the meltemi — and what the settlement rules allow.
- F-36 Generators and backup power Backup generators sized for August load, with changeover switching and servicing that is actually done.
- F-37 General handyman The accumulated list of small jobs, batched into one visit instead of six callouts.
Permits and professional services
11 itemsApprovals are the longest stage on most Santorini projects. These run before and alongside construction, never after the design is frozen.
- P-01 Building permit support Assembling and coordinating the οικοδομική άδεια, and the approvals that must precede it.
- P-02 Architectural design Architectural design coordinated within the planning envelope and settlement controls.
- P-03 Civil and structural engineering Civil and structural engineering: design, assessment, and statutory supervision.
- P-04 Topographic survey The survey that underpins every application, and the boundary problems it routinely uncovers.
- P-05 Archaeological approval Engaging the Ephorate of Antiquities of the Cyclades, and planning a programme around it.
- P-06 Council of Architecture approval Council of Architecture review: what it examines, and how to get through it first time.
- P-07 Energy performance certificate (ΠΕΑ) The ΠΕΑ: when it is required, what is assessed, and which upgrades change the rating here.
- P-08 Cadastral and Ktimatologio matters Cadastral checks: why a registration discrepancy stops a permit, and what usually causes one.
- P-09 Legalisation of unauthorised structures Resolving αυθαίρετα: what blocks a permit or a sale, and what can realistically be regularised.
- P-10 Short-term rental compliance What a property physically needs before it is let short-term, beyond the registration itself.
- P-11 Tourist accommodation licensing support Licensing support from the building side: keeping the as-built consistent with the licence.
Not sure which of these you need?
Most owners arrive with a symptom rather than a service: a wet wall, a crack above a door, a hotel that has to open in April, a plot with an unclear permit history. Describe the symptom and we will tell you which package it actually is — often it is cheaper and smaller than expected, and occasionally it is a structural engineer rather than a builder.