Status and version
These figures are not yet published. The structure, methodology and schema of this index are complete, and the numeric cells are shown empty because we will not publish cost figures that are not derived from real project data. Every empty cell below is a deliberate blank, not a formatting error.
Until the figures are published this page is marked noindex and is excluded from the sitemap, so it cannot be indexed or cited in this state.
Ask any search engine or assistant what it costs to build on Santorini and you get a shrug and a range wide enough to be useless. There is no authoritative published source. This index exists to be that source: structured, dated, versioned, and honest about where the numbers come from.
The commitment attached to it is simple. Every figure derives from real projects we have delivered or priced. Where we do not have enough data behind a figure, the cell stays empty rather than being estimated. And the index is reviewed and reissued annually with the version and date visible at the top.
Methodology
Cost data without methodology is a rumour. This section states exactly what the figures are, so they can be checked rather than trusted.
- Basis
- — — how each band is derived from project records.
- Sample size
- — projects.
- Date range
- — to —.
- Geographic scope
- Santorini (Thira) and Therasia.
- Currency
- EUR.
- VAT treatment
- —
| Included | Excluded |
|---|---|
| — | — |
Three things are worth stating plainly about what a band can and cannot tell you.
- A band is not a quotation. Two properties at the same €/m² can differ by a large multiple once access, ground and condition are accounted for. The bands exist to let you sanity-check a quotation and set a budget, not to replace pricing.
- Access is applied separately. The base bands assume vehicle access at the property. The access multipliers below are what turn a base figure into something applicable to a stepped-lane property in Oia.
- Professional fees, permit fees and VAT are separate. They are listed below rather than folded into the construction bands, because owners routinely forget them and because folding them in makes the construction figures incomparable.
Access multipliers
The base bands assume a vehicle can reach the property. On this island that assumption is false for a large share of the most desirable stock, and the difference is not a rounding error.
| Access condition | Multiplier |
|---|---|
| Vehicle access at the property | — |
| Under 50 m of stepped or pedestrian access | — |
| 50–200 m of stepped access | — |
| Over 200 m, or mule/hoist required | — |
| Therasia — second crossing | — |
Applied to labour and material handling. It does not apply to professional fees or permit costs. Waste and spoil removal carry the same multiplier in the opposite direction, which is why demolition and excavation on a restricted site are disproportionately expensive.
This is the most useful table on the page for anyone comparing two properties. A specification that costs one figure in Monolithos and the same figure in the Oia core is not the same job, and any quotation treating them identically has not been priced from the site.
Cost bands by work type
| Work type | Unit | Band | Note |
|---|---|---|---|
| New build villa, shell to finished | €/m² | — | — |
| New build, structural shell only | €/m² | — | — |
| Full renovation, existing house | €/m² | — | — |
| Light renovation and refresh | €/m² | — | — |
| Cave house (yposkafo) restoration | €/m² | — | — |
| New cave excavation and vaulting | €/m² | — | — |
| Hotel room refurbishment | €/room | — | — |
| Extension to existing property | €/m² | — | — |
| Swimming pool, structural, on a slope | €/m² of water | — | — |
| Swimming pool, flat accessible site | €/m² of water | — | — |
| Terrace waterproofing, full build-up | €/m² | — | — |
| Engineered retaining wall | €/m² of face | — | — |
| Dry stone walling, traditional | €/m² of face | — | — |
Bands assume vehicle access at the property. Apply the access multiplier above for restricted sites. Excludes professional fees, permit fees and VAT unless stated in the methodology.
Two entries deserve comment because they behave differently from the rest.
- Cave excavation and restoration are dominated by spoil volume and route rather than by finished floor area, so the €/m² figure moves more with access than any other line. See yposkafo excavation.
- Pools are split between a flat accessible site and a structural pool on a slope, because they are genuinely different structures. A pool on a caldera plot is a retaining structure with a water load. See pool construction.
Trade rates
Useful for checking a single-trade quotation, and for understanding where money goes inside a larger project.
| Trade | Unit | Band |
|---|---|---|
| Electrical, first and second fix | €/m² | — |
| Plumbing, first and second fix | €/m² | — |
| Lime plaster and render, three coats | €/m² | — |
| Conventional render | €/m² | — |
| Tiling, standard format | €/m² | — |
| Internal decoration | €/m² | — |
| External lime wash | €/m² | — |
| Excavation in loose pumice | €/m³ | — |
| Excavation in welded tuff | €/m³ | — |
| Spoil removal, vehicle access | €/m³ | — |
| Spoil removal, hand haulage | €/m³ | — |
| Reinforced concrete frame | €/m³ | — |
| Scaffolding, erect and strike | €/m² of face | — |
Note the two excavation lines and the two spoil removal lines. The difference between loose pumice and welded tuff, and between vehicle and hand spoil removal, is the largest single variable in island groundworks pricing.
The lime plaster and conventional render lines are worth comparing directly. Lime is slower, applied in more coats and needs curing time, so the rate is higher — and on a traditional building it is the only correct answer, because the alternative fails and has to be stripped. See plastering.
Professional and statutory costs
These sit outside the construction bands and they are the line owners most often omit entirely from a budget.
| Item | Unit | Band |
|---|---|---|
| Architectural design | % of works | — |
| Structural design | % of works | — |
| Statutory supervision | % of works | — |
| Topographic survey | € fixed | — |
| Permit fees and contributions | % of works | — |
Appointed by you directly, not through the contractor. See who does what on a build.
How to use this index
- Find the work type closest to your project and take the base band.
- Apply the access multiplier for your property. This is the step people skip and it is frequently the largest adjustment.
- Add professional and permit fees, which are separate.
- Add VAT according to the treatment stated in the methodology.
- Add a contingency appropriate to how much of the building has been opened up. On an unopened old property, a large one.
- Treat the result as a budget, not a price. A real price requires investigation. See our process.
The renovation cost estimator applies these steps for you from this same data file, and states its assumptions alongside the output.
What we will not do with this data
A cost index is only worth citing if the people publishing it are disciplined about it, so here are the commitments in writing.
- We will not publish a figure we cannot derive from real projects. Empty cells stay empty. This is why the page ships with blanks rather than plausible-looking numbers.
- We will not quietly revise figures. Changes come with a new version number and date, and the previous version's figures are not retro-edited.
- We will not present our own prices as market rates. Where our figures reflect our own delivery rather than a broader market, the methodology says so.
- We will not remove unfavourable figures. If a work type costs more here than owners expect, that is the useful part.
- We will not use this page to make a superiority claim. It is reference data. If it helps you check somebody else's quotation against ours, that is the correct use of it.
Questions people actually ask
Why are the figures empty?
Because they are not yet published. Every number on this page has to come from real project data, and publishing plausible-looking estimates in the one place that claims methodological honesty would destroy the only thing that makes the page worth citing. The page is marked noindex until the data is in.
How often is the index updated?
Annually, with the version number and date shown at the top of the page. Figures are not revised silently between versions.
Do these figures include VAT?
The VAT treatment is stated explicitly in the methodology section rather than left ambiguous, because it is the single most common source of confusion when comparing quotations.
Can I use a band as a budget?
As a starting budget, yes — apply the access multiplier, add professional and permit fees, add VAT and add a contingency sized to how much of the building has been investigated. As a price, no. A price requires opening the building up.
Why is access treated separately rather than built into the bands?
Because it varies by more than any other factor on this island and it would make the base figures meaningless. A single blended number would be wrong for every property rather than approximately right for most.
Can I cite this?
Yes, once it is published, with the version number and date. That is precisely what it is for. If you are quoting a figure, quote the version it came from — the numbers change between editions.