For hotel and resort owners

The date does not move. Everything else is negotiable.

Short answer

A hotel refurbishment on Santorini is a closed-season programme with a fixed end date, and the binding constraint is almost never labour on site — it is material lead times crossing by ferry. The programme is built backwards from opening, and long-lead items are ordered before the design is finished.

What to expect

Typical durationClosed season, Nov–Mar
Cost bandFigures live in the cost index
Permit requiredDepends on scope · licence interaction likely
Seasonal constraintThe defining constraint

What is different about hotel work

  • Programme backwards from opening, with dressing, commissioning and snagging protected at the end rather than compressed.
  • Order long-lead items before the design is finished. Freeze the sub-set of decisions that govern manufacture, and let the rest keep moving. This saves more programme than anything else available.
  • Survey the season before. The four things strip-out finds — waterproofing, drainage capacity, electrical loading, corrosion at fixings — cannot be absorbed by a February programme if they are discovered in January.
  • Report weekly against the programme, with the date risk stated explicitly rather than at the end.
  • Coordinate with the licence. Room counts, escape routes and compartmentation all interact with it. See tourist accommodation licence.

The four things strip-out finds

The brief is usually "refresh the rooms". What comes out of the walls is usually one of these, and none of them is decoration.

What refurbishment actually turns out to be
FindingWhy it happens hereCost of deferring
Terrace waterproofing above occupied roomsThermal movement, full sun, detailing without movement jointsGrows into the ceiling below
Drainage at capacityProperty extended onto a system sized for the originalFails at peak occupancy
Electrical loadingAir conditioning, induction, pool plant and EV added incrementallyNuisance tripping in August
Corrosion at balustrades and fixingsSalt on anchors and hardwareSafety, on a caldera terrace

We survey for all four before pricing rather than discovering them in January.

Phased work with the hotel trading

Half the property open while the other half is a site is frequently the only commercially viable option, and it changes the method substantially.

  • Noise-generating work confined to agreed hours and to periods when adjacent rooms are not sold — agreed before pricing, not after.
  • Dust and route separation, which matters more to guests than the works themselves.
  • Material movement scheduled around guest movement, which on a caldera hotel with a single stepped access route is the hardest logistical problem on the job.
  • Early morning deliveries and waste removal, which affects both cost and crewing.

Between seasons, every year

The properties that avoid expensive surprises are the ones that treat the closed season as a maintenance window rather than only a refurbishment window.

  • Pre-season servicing: air conditioning, pool, solar, water systems, extract. Booked in autumn, done before March.
  • Terrace outlets and gutters cleared before winter and checked after storms.
  • Balustrade fixing inspection, documented. On a property with a drop this is a genuine safety item. See glass balustrades.
  • Deep clean and external clean before opening. See post-construction cleaning.
  • A defect list kept through the season and executed in November, rather than remembered in April.

Questions people actually ask

Can an opening date be guaranteed?

A contractor can commit to a programme, an explicit float allowance and weekly reporting against it, and they we tell you the moment a date is at risk. Anyone guaranteeing an opening date irrespective of ferry cancellations and supplier lead times is guaranteeing something outside their control.

When should we start planning next winter's works?

During this season. Survey in summer, design in autumn, order long-lead in September, on site in November. Properties that start planning in October are already late.

Can you work with our interior designer?

Usually, and it is common. Our role is making the design buildable inside the window and flagging early where a specification will not land in time.

Do you handle the pool between seasons?

Yes. Winter neglect is the single most expensive avoidable pool cost on this island. See pool maintenance.

What about the licence?

Anything touching room counts, escape routes, compartmentation or facilities interacts with it. They coordinate with your licensing consultant rather than replacing them.

One request. The right trade.

Tell us what needs doing

One request, two minutes. We read every one and point you at the tradesperson who handles this. Free, and you deal with them directly.

Message us

Ask about this page

A question about this specific job, or about something else entirely. It reaches a person, not a queue, and there is no obligation.

Your message will tell us you were reading Hotel and resort contracting

Plain words are better than trade words. If you have photographs, say so and reply to our email with them attached.

We use what you send only to answer you. Privacy.